Barrel Cactus Energy Storage LLC — zoning filings
2 tracked case(s) across 1 city (Peoria). Hearing dates and full case detail below.
| Counties | Maricopa |
|---|---|
| Most active in | Peoria (2) |
| Typical filings | PD Amendment (2) |
| Proposed uses | Utility-scale battery energy storage system (BESS) with supporting infrastructure including battery enclosures, inverters, transformers, on-site substation, and perimeter screening, Battery Energy Storage System (BESS) - 120 MW / 960 MWh capacity with on-site substation |
| Activity | 2026-08-20 → 2026-08-20 |
Want the next one the day it files? Add Barrel Cactus Energy Storage LLC as a keyword and Zoning Firehose emails you the moment they appear on any agenda — days before the hearing. Start a free trial.
| Case | City | Proposed use | Hearing |
|---|---|---|---|
| 21-153 | Peoria | Utility-scale battery energy storage system (BESS) with supporting infrastructure including battery enclosures, inverters, transformers, on-site substation, and perimeter screening | 2026-08-20 |
| Z21-06A.2 | Peoria | Battery Energy Storage System (BESS) - 120 MW / 960 MWh capacity with on-site substation | 2026-08-20 |